The Wirral line is one of two commuter rail routes operated by Merseyrail and centred on Merseyside, England, the other being the Northern line. It connects the city of Liverpool to the Wirral Peninsula through a special underground tunnel called the Mersey Railway Tunnel. From Liverpool, the line goes in a loop and has stops that reach places like New Brighton, West Kirby, Chester and Ellesmere Port.
The Wirral line got its name when the Merseyrail network officially started on 25 October 1978, with Queen Elizabeth II opening it during the time of British Rail. The trains on this line use electricity from a special DC third rail to move. The line has looked almost the same since May 1994 when electric trains began running to Ellesmere Port. There are 34 stations along the route, and you can switch to bigger trains at spots like Liverpool Lime Street, Bidston, Ellesmere Port and Chester. The Wirral line also links up with the Northern line of Merseyrail at Liverpool Central and Moorfields.
History
The Wirral line was not originally one single route but used several railway lines built by different private companies. After laws changed in 1921, three big companies worked on the Wirral Peninsula until 1948 when they all joined British Railways. In the 1970s, the Merseyrail network was developed under British Rail. In the 1990s, services were run by private companies again after changes in the law.
Pre-grouping
Chester and Birkenhead Railway
Part of the Chester and Birkenhead Railway is the oldest part of today’s Wirral line. The route between Chester and Birkenhead was checked by George Stephenson in 1830, but the company wasn’t created until 1837. Building started in 1838 and finished in 1840, with the first train, called “The Wirral,” taking 50 minutes to travel the line. The line was later extended and improved over the years.
Wirral Railway
The Hoylake Railway started in 1863, building a line between Birkenhead and Hoylake. It faced money problems and was sold, but kept running. It was later extended to places like West Kirby and Seacombe.
Mersey Railway
The idea to connect Birkenhead and Liverpool by a tunnel was first suggested in 1864. After many plans and problems, construction finally began in 1881. The tunnel was finished in 1885, and the railway opened in 1886. It was later electrified in 1903, making it the first railway in Britain to switch from steam to electric power.
The Big Four
In 1923, big changes happened in Britain’s railways, grouping companies into four large ones. The Wirral Railway joined the London, Midland and Scottish Railway, while other lines joined different groups. Electrification plans for the Wirral Railway started in 1935 and were finished by 1938.
British Railways
After World War II, all railways in Britain were nationalized in 1948. Services continued as before, but changes were coming. In the 1960s, many stations were set to close, including Birkenhead Woodside. New plans were made to keep local services running by creating a network called Merseyrail.
The development of Merseyrail
To keep local rail services, Liverpool City Council suggested creating Merseyrail. This included building a loop tunnel under Liverpool’s city centre. The Loop Tunnel was built in the early 1970s, and the first part of Merseyrail opened in 1977. New trains were bought to run these services.
Post-privatisation
In the 1990s, British Rail was broken up and sold to private companies. Merseyrail continued to run under different owners. In 2003, Merseytravel took over responsibility for Merseyrail, and it is now run by a company called Serco-Abellio under a long-term contract.
Infrastructure
Track
All the railway lines use the same width, called standard gauge. Most of the track can only fit smaller trains, which makes it less useful for big freight trains. In 2017, the track under the river was replaced over six months.
Electrification
The whole network uses electricity from a special third rail. This system started in 1903, making it the first railway in the world to use full electrification. Another part was electrified in 1938. A loop was added in 1977, and more parts were added in the 1980s and 1990s.
Rolling stock
In 1938, new trains with sliding doors were introduced. These trains were later replaced in 1983 with new units. In the late 1990s, maintenance of these trains happened at two special places. In 2012, plans began to replace the old trains, and new ones started arriving in 2019, finishing the replacement by 2021.
Services
From Monday to Saturday, trains run every 15 minutes from Liverpool to New Brighton, West Kirby, and Chester. They run every 30 minutes to Ellesmere Port. During busy times, extra trains run to and from Ellesmere Port, making it every 15 minutes in those directions. Hooton is where you can switch between trains going to Ellesmere Port and Chester. Because of the COVID-19 pandemic, train schedules changed in March 2020, but by mid-2022, they were getting closer to the old schedule again.
You can switch to the Northern line at Liverpool Central and Moorfields, and to the City line at Liverpool Lime Street. Transport for Wales runs trains from Bidston along the Borderlands Line to Wrexham Central. There have been ideas to add electric power to parts of this route and include it in the Wirral line. You can also connect to other National Rail services at Liverpool Lime Street and Chester, and there is a train from Ellesmere Port to Helsby and Warrington Bank Quay.
Images
Related articles
This article is a child-friendly adaptation of the Wikipedia article on Wirral line, available under CC BY-SA 4.0.
Images from Wikimedia Commons. Tap any image to view credits and license.
Safekipedia