The A3 motorway (Romanian: Autostrada A3) is a partly built motorway in Romania. It is planned to connect Bucharest with the Transylvania region and the north-western part of the country. When finished, it will be 596 km long. It will pass through Ploiești, Brașov, Făgăraș, Sighișoara, Târgu Mureș, Cluj-Napoca, Zalău and Oradea, and it will join Hungary's M4 motorway near Borș.

As of July 2025, about 204 km (127 mi) of the road is open. This includes the Bucharest – Ploiești motorway (62.5 km), the Râșnov – Cristian segment (6.3 km), the Târgu Mureș – Nădășelu segment (117 km) and the Biharia – Borș segment (5.4 km).

In January 2015, the section between Târgu Mureș and Câmpia Turzii was awarded for construction. It was split into two larger parts, with five lots that together add up to 51.8 km. By December 2021, all of these parts had been opened to traffic, except for Chețani − Câmpia Turzii (15.7 km). The contract for that stretch was ended in March of that year.

More work on the Nădășelu – Borș section (about 157 km in total) was put up for bidding between 2018 and 2019. Contracts were awarded for the Biharia − Borș segment (5.4 km, near the border with Hungary) in December 2018, the Chiribiș − Biharia segment (28.6 km) in June 2020, and the Zimbor – Poarta Sălajului segment (12.2 km) in the same month. Several other segments are still waiting to be awarded.

In August 2020, the 5.2 km segment between Comarnic South and Comarnic North, on the Comarnic − Brașov section (58.0 km), was put up for bidding again.

Bucharest – Brașov section

This motorway section, also called the "Snow Motorway", will cross the Carpathian Mountains along the Prahova Valley. The Comarnic – Brașov part is considered the hardest to build. The road will also connect to the future Terminal 2 of the Henri Coandă Airport and the future Bucharest – Chișinău motorway, through the Ploiești South-East (Dumbrava) interchange. The project was split into three larger sections. Work on the Bucharest – Ploiești section started on 15 March 2007, and the Bucharest Ring Road – Ploiești part opened on 19 July 2012. The last part through Bucharest opened on 14 December 2018.

Work on the Comarnic – Brașov section was due to begin in 2010, but the contract was cancelled after the Vinci–Aktor consortium withdrew. A new contract was awarded in December 2013 to a joint venture of Vinci, Strabag and Aktor, but the concession had been cancelled by June 2015. The project was tendered again later, and in early 2020 it was cancelled by the newly elected government. In December 2020, the Râșnov – Cristian segment opened.

Bucharest – Brașov section
SectionLengthPeriod of constructionContractorTotal costFinancierStatus
Bucharest – Moara Vlăsiei19.5 kmMay 2008 – August 2017Impresa Pizzarotti and Tirrena Scavi673.7 m leiState budgetIn service
Moara Vlăsiei – Ploiești43.0 kmJuly 2007 – August 2012Spedition UMB, Pa&Co Internațional, EuroConstruct Trading '98, Com-Axa883.7 m leiState budgetIn service
Ploiești – Comarnic48.6 km379.4 m euro (est.)Planned
Comarnic – Brașov58 kmState budgetOne segment in service, the rest - planned
Comarnic – Brașov section
SectionLengthPeriod of constructionContractorTotal costFinancierStatus
Section 1: Comarnic Sud – Comarnic Nord5.2 km68.6 m euroRe-tendered
Section 2: Comarnic Nord – Bușteni16.3 kmFeasibility studies
Section 3: Bușteni – Predeal12.8 kmFeasibility studies
Section 4: Predeal – Râșnov15.2 kmFeasibility studies
Section 5: Râșnov – Cristian6.3 kmOctober 2017 – December 2020Alpenside25.8 m euroState budgetIn service

Brașov – Oradea section

A3 motorway between Cluj-Napoca West (Gilău) and Turda

This motorway section, known in Romanian as Autostrada Transilvania (Romanian), was split into three parts: the Brașov (Cristian) – Târgu Mureș (Ogra) segment, the Târgu Mureș (Ogra) – Cluj-Napoca West (Gilău) segment, and the Cluj-Napoca West (Gilău) – Oradea West (Borș) segment. Some parts are already open. The Câmpia Turzii – Nădăşelu segment opened in several stages between 2009 and 2018, and the Ungheni – Chețani segment opened in several stages between 2018 and 2020. The Biharia − Borș segment is also open. The Suplacu de Barcău – Borș segment has been under construction since 2004, but its contract was ended in May 2013, when the work was about 50% finished.

The project was first planned to be built by the American company Bechtel Corporation with its partner Enka. In 2004, the contract was given to Bechtel by Social Democrat Prime Minister Adrian Năstase without an open bidding process, citing "national security." The estimated cost rose from 2.8 billion € in 2003 to 4.7 billion € in a 2007 estimate. In 2011, the contract was renegotiated. Bechtel agreed to lower the building cost per kilometer by 50%, to 6.9 million euro, and would build only two segments, leaving the others open for tendering. The whole section was finished on December 15, 2023, when the last part between Chețani and Câmpia Turzii was completed. Traffic opened the following week, and people in Mureș county can now drive from Târgu Mureș by using the A10 in Turda and then the A1 motorway, all the way to the Hungarian border in Nădlac and onward to most of Europe.

Openings timeline

Many parts of the A3 motorway have opened since 2009. The first was the Turda to Cluj-Napoca West (Gilău) segment, which opened on 1 December 2009 and helps drivers go around the city of Cluj-Napoca. Other early parts were the Câmpia Turzii to Turda segment in 2010, the Bucharest Ring Road to Ploiești segment in 2012, and the Cluj-Napoca West to Nădășelu segment in 2018. More segments opened in 2018, 2020, 2021, and 2023, including Nuşfalău to Suplacu de Barcău and Cheţani to Câmpia Turzii. The newest opening in the list is Zimbor to Poarta Sălajului, which opened on 11 August 2026.

Progress on construction was recorded as of July 2020. Some other segments have contracts signed and are in the early stages of design and construction. One of these is the Nădăşelu to Zimbor segment, which is due in March 2027.

Exit list

CountyLocationkmmiDestinations
City of Bucharest63.7Gherghiței Street, Bucharest
IlfovVoluntari95.6Popasului Street, Voluntari
Ștefăneștii de Jos138.1 DNCB – Bucharest
169.9Short-term parking
2214 A 0 – Bucharest
Moara Vlăsiei2314Short-term parking, north-bound only
2516 DJ101 – Moara Vlăsiei, Balotești
2616Short-term parking, south-bound only
Snagov3019 DC184 – Snagov
Gruiu3421Short-term parking
3824Bridge over Ialomița river
PrahovaGherghița4125Short-term parking
4327 DJ100B – Gherghița
Drăgănești4729Bridge over Prahova river
Dumbrava, Prahova4930Short-term parking
5333 A 7 – Ploiești East, Buzău
Râfov5635Short-term parking
Bărcănești6339Short-term parking
6842 DN1 – Ploiești South
Missing connection north towards Râșnov
BrașovRâșnov00.0 DN73 – Râșnov, Bran
63.7 DN73G / DJ112B – Brașov South, Cristian
Missing connection north-west towards Târgu Mureș
MureșGheorghe Doja00.0DN15J – Târgu Mureș West
Ungheni21.2 DJ151D – Acățari
42.5 DN15 – Ungheni, Târgu Mureș International Airport
Sânpaul74.3Short-term parking
Iernut1811 DN14A – Iernut, Târnăveni
Bogata3119Bridge over Mureș river
Luduș3220Short-term parking
3421Bridge over Mureș river
Chețani3622 DN15 – Chețani, Luduș
ClujCâmpia Turzii00.0 DN15 – Câmpia Turzii
Mihai Viteazu95.6 A 10 – Alba Iulia, Sebeș
95.6 DN1 – Turda, Aiud
106.2Short-term parking
127.5U-turn exit
127.5Bridge over Arieș river
Petreștii de Jos2113 DEx4 – Tureni, Cluj-Napoca South
Săvădisla4427U-turn exit
Florești4629Short-term parking
Gilău5132 DN1 – Cluj-Napoca West, Gilău
5232Bridge over Someșul Mic river
Gârbău6138 DN1F – Cluj-Napoca North, Nădășelu
Missing connection north-west towards Zimbor
SălajZimbor00.0 DN1G – Zimbor, Huedin
Românași127.5 DN1F – Poarta Sălajului
Missing connection west towards Nușfalău
SălajNușfalău00.0 DN1H – Nușfalău, Huedin
21.2Short-term parking
Ip31.9U-turn exit
Suplacu de Barcău138.1 DN19B – Suplacu de Barcău
Missing connection west towards Biharia
BihorBiharia00.0 DN19 – Oradea North, Biharia
21.2 DEx16 – Oradea West, Arad
42.5Short-term parking
53.1 M4 – Debrecen
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
      Unopened

Quiz time!

5 questions about A3 motorway (Romania)

Question 1 of 5

What is the A3 motorway planned to connect?

Pictures

A view of the Bucharest-Ploiești motorway in Romania, photographed near kilometre marker 49.
The A3 motorway between Bucharest and Snagov, which has three lanes in each direction, with overhead power lines running alongside.
A general view of the Suplacu de Barcău Viaduct, a large bridge under construction in Romania in 2008.
A simple icon showing a trolleybus, the electric bus that gets its power from overhead wires.
The logo of Transferoviar Călători, a railway passenger company in Romania.

Keep exploring

This article is a child-friendly adaptation of the Wikipedia article on A3 motorway (Romania), available under CC BY-SA 4.0.

Images from Wikimedia Commons. Tap any image to view credits and license.