CAPSTONE, also known by its backronym, is a lunar orbiter. Its full name is Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment. It is testing and checking the calculated orbital stability planned for the now canceled Lunar Gateway space station.
The spacecraft is a 12-unit CubeSat. It is also testing a navigation system that measures its position relative to NASA's Lunar Reconnaissance Orbiter (LRO) without relying on ground stations.
CAPSTONE was launched on 28 June 2022 and arrived in lunar orbit on 14 November 2022. It was scheduled to orbit for six months. On 18 May 2023, it completed its main mission of orbiting in the near-rectilinear halo orbit for six months. It will stay on this orbit and keep performing experiments during an enhanced mission phase. On 6 July 2026, NASA declared its mission complete, though Advanced Space will continue to operate the spacecraft as a technology testbed.
Background
The Lunar Gateway was a space station being planned by several national space agencies since at least 2018, including NASA, the European Space Agency (ESA), and the Canadian Space Agency (CSA). It was planned for a lunar orbit that had never been used before CAPSTONE. The station was expected to serve as a communications hub, a science laboratory, a short-term place to live, and a holding area for rovers and other robots. It was also meant to play a major role in NASA's Artemis program. In March 2026, NASA announced that it would cancel the station and instead focus on developing a lunar surface base between 2029 and 2036.
Computer simulations showed that a near-rectilinear halo orbit (NRHO) offers long-term stability and needs little fuel to stay in place. This stability comes from a balance point between the pull of Earth and the Moon. The main goal of the CAPSTONE mission is to test these simulations with a real spacecraft, and it is the first spacecraft to operate in an NRHO. It is also testing a navigation system called Cislunar Autonomous Positioning System (CAPS), which measures its position relative to NASA's Lunar Reconnaissance Orbiter (LRO) without relying on ground stations.
Spacecraft
The orbiter is a 12-unit CubeSat. A private company called Advanced Space, in Boulder, Colorado, was awarded a US$13.7 million contract on 13 September 2019. The contract came through a federal Small Business Innovation Research (SBIR) program. Advanced Space managed the project and built some of the spacecraft's key technology, including its CAPS positioning navigation system. Tyvak Nano-Satellite Systems, in Irvine, California, developed and built the spacecraft bus. Stellar Exploration, Inc developed the propulsion systems, which used Hydrazine.
Launch
NASA announced on 14 February 2020 that CAPSTONE would launch on a Rocket Lab Electron rocket from the company's new launch site, the Mid-Atlantic Regional Spaceport (MARS) on Wallops Island in Virginia. The launch was planned for October 2021, but it was delayed and moved to Mahia, LC-1 in New Zealand. The launch contract was worth US$9.95 million. Rocket Lab's new Virginia launch pad was finished in 2019, but certifying the Autonomous Flight Termination System (AFTS) took longer than expected, so the launch site was changed to Mahia.
CAPSTONE launched on 28 June 2022. After separating from the second stage, Rocket Lab's Photon kick stage raised the spacecraft's orbit over six days by firing the HyperCurie engine six times, followed by a trans-lunar injection (TLI) burn. Then the spacecraft was released on its journey to the Moon. NASA lost contact with the spacecraft on 5 July but regained it on 6 July. By 30 September, CAPSTONE was "power positive" and on a stable path towards the Moon, while the team worked to regain control of its orientation. The problem was traced to a thruster valve that was probably partly open. On 7 October, the team sent recovery commands, stopped the spin, and regained full control. The spacecraft stayed on track to enter its planned orbit.
Ballistic lunar transfer
CAPSTONE used a ballistic transfer to reach the Moon instead of a more usual direct Hohmann transfer. This kind of path took much longer, about four months compared with about three days for a traditional direct transfer. However, it greatly reduced the engine power needed, which allowed about 10–15% more mass to be delivered.
After being pushed out of Earth orbit by a series of burns from the Photon stage, the spacecraft reached a distance of about 1.5 million kilometers. There, perturbations from the Sun became important. It then fell back towards Earth, crossed the Moon's orbit, and on 14 November 2022 entered NRHO around the Moon.
Mission
After a three-month trip to the Moon following launch, the CAPSTONE lunar satellite spent six months collecting data during this demonstration. It flew within 1,000 mi (1,600 km) of the Moon's North Pole on its closest pass and 43,500 mi (70,000 km) from the South Pole at its farthest.
Animation of CAPSTONE
Around the Earth
Around the Moon – Frame rotating with Moon – Front view
Around the Moon – Frame rotating with Moon – Side view
Earth · CAPSTONE · Moon
On 7 February 2025, NASA extended its partnership with Advanced Space through December 2025 for the CAPSTONE mission. After the CAPS navigation system was successfully demonstrated and a special kind of orbit around the Moon was studied, the extended mission will further test and improve CAPS. It will use communication with NASA's Lunar Reconnaissance Orbiter and Deep Space Network. The mission will also support Artemis and Gateway planning and, with NASA's Goddard Space Flight Center, demonstrate new communication technologies for the area around the Moon and Earth.
Follow-up mission
A second mission, called CAPSTONE 2, is scheduled to launch no earlier than 2027.

Quiz time!
5 questions about CAPSTONE
What kind of spacecraft is CAPSTONE?
Pictures
Keep exploring
This article is a child-friendly adaptation of the Wikipedia article on CAPSTONE, available under CC BY-SA 4.0.
Images from Wikimedia Commons. Tap any image to view credits and license.