CapMetro Rail
CapMetro Rail is a hybrid rail service in the Greater Austin area in Texas. It is owned by CapMetro, Austin's primary public transportation provider.
The Red Line is CapMetro's first and currently only rail line. It connects Downtown Austin with Austin's northwestern suburbs. The line runs on 32 miles (51 km) of existing freight tracks and serves 10 stations.
After a series of delays, CapMetro Rail was inaugurated in March 2010. CapMetro added Friday evening and Saturday afternoon and evening regularly scheduled service on March 23, 2012. In 2025, the line had a ridership of 620,600, or about 1,900 per weekday as of the second quarter of 2026.
Several proposals to build new tracks through the busiest parts of the city have been put forward over the years. Austin voters chose not to commit funds to a light rail system in 2000 and 2014, but they did so in 2020. Since then, CapMetro has been planning new rail lines as part of the Project Connect plan.
The Orange and Blue light rail lines would bring rail service to the western half of Downtown, the University of Texas at Austin, and the city's airport. The Green Line would operate similarly to the Red Line, running on existing freight tracks between Austin, Manor, and Elgin.
History
Supporters of urban rail asked the city of Austin to build a passenger rail system during the 1970s energy crisis. When voters created CapMetro in 1985, the agency was expected to run local bus services and also to plan future passenger rail. In 1986, CapMetro and the City of Austin bought the 162-mile (261 km) Giddings-to-Llano Austin and Northwestern Railroad (A&NW) from the Southern Pacific Transportation Company, with the goal of someday running passenger trains on it. Part of the money came from a grant from the Federal Transit Administration. In 1997, the Texas Legislature ordered CapMetro to hold a vote on light rail. The 2000 plan included a 14-mile starter line from a station at Howard Lane to another at the Lamar / Airport intersection, with later phases reaching a Leander station. Voters narrowly rejected it, with 49.6% in favor. In 2004, CapMetro returned with a smaller plan for a single diesel commuter line, which voters in Travis County and Williamson County approved with 62% support. The line was planned to serve areas such as the Highland Mall area, the Mueller Community, the University of Texas at Austin, and the area near Lady Bird Lake.
Service on CapMetro Rail began on March 22, 2010, about two years later than first planned. In 2014, TxDOT gave CapMetro a $50 million grant for new rail cars and improvements to the Downtown station. Planning for a permanent downtown station, run by CapMetro, began in 2015, and it opened on October 19, 2020. That same year, Austin-area voters rejected a light rail plan in 2014 with only 43% in favor. Voters later approved a larger plan called Project Connect in November 2020, with 58% in favor. It included a Blue Line to the airport that would connect with the Orange Line Downtown through a 1.6-mile tunnel, plus a Gold Line Bus Rapid Transit route, a Green Line to Manor and Elgin, and new bus park-and-rides. By 2022, costs had risen, partly due to a Capitol View Corridor and community concerns that doubled the planned tunnel's length. In June 2023, the Austin City Council approved a cheaper version of the project with no tunnel, which would start on 9.8 miles of street lanes. Some Republican lawmakers have opposed the project, and Republican senator John Cornyn has said he does not support federal funding for it.
Operation
The Red Line is currently the only line in the CapMetro Rail system, and it is also called Route 550 on some internal CapMetro documents. It runs along 32 miles (51 km) of track that connects Leander and the Austin Convention Center in Downtown Austin. The line also passes through Cedar Park, northwest Austin, north-central Austin, and east Austin. It costs $14.3 million a year to run. Most of its nine stations were built along existing freight rail tracks, working with the City of Austin. This followed a transit-oriented development plan that aimed to encourage people to use public transportation by building mixed-use homes and shops around the stations. Each station has an accessible platform, ticket vending machines, bike racks, and information displays.
In January 2011, CapMetro added 13 midday trains and more trains during busy hours. In March 2012, it began running trains on a regular schedule on Fridays and Saturdays. Before that, CapMetro ran weekend trains only for special events, such as the SXSW festival. Frequencies are expected to improve to every 15 minutes after double tracking is completed between Lakeline and Leander. The following Red Line stations are listed north to south:
Trains run past midnight on Fridays and Saturdays, but the last train leaving downtown Monday through Thursday leaves at 7:20 pm.
| County | Community | Station | Connections and notes |
|---|---|---|---|
| Williamson | Leander | Leander | CapMetro Bus 985, 987 |
| Avery Ranch-Lakeline, Austin | Lakeline | MetroBus 214, 383, 985, 987 | |
| Travis | Northwest Austin | Howard | MetroBus 50, 243 |
| North Burnet-Gateway, Austin | North Burnet/ Uptown | Planned to open in 2027 | |
| North Burnet-Gateway, Austin | Kramer | MetroBus 392, 466 Slated to closed in 2027 after the opening of North Burnet/Uptown station | |
| North Burnet-Gateway, Austin | McKalla | ||
| Crestview, Austin | Crestview | MetroBus 1, 7, 300, 350, 801 (CapMetro Rapid) | |
| Highland, Austin | Highland | MetroBus 7, 324, 337, 350 (at Highland Mall transit hub) | |
| Chestnut, Austin | MLK Jr. | MetroBus 18, 465 | |
| East Cesar Chavez, Austin | Plaza Saltillo | ||
| Downtown Austin | Downtown | MetroBus 2, 4, 6, 7, 10, 17 (walking distance), 837 (CapMetro Rapid) |
Rolling stock
In September 2005, Stadler Rail won a bid to build six Stadler GTW diesel-electric light regional railcars for the system. Each vehicle's capital cost is about $6 million. The trains are 9 feet 8 inches (2.95 m) wide and 134 feet (41 m) long. In 2017, CapMetro received 4 new trains from Stadler for the Red Line. This raised the fleet from 6 to 10, which allowed CapMetro to run trains more often. The new trains have LED destination displays instead of the flip-dot displays on the older trains, and a slightly different paint scheme.
The trains can carry 200 passengers, with 108 seats and 92 standing spots. They have priority seating areas for wheelchair users that are fully ADA compliant, plus a "VIP section" with room for laptops and Internet access. Each train has bike racks, luggage racks, and a low floor for easy entry. The trains get Internet access through 3G cellular service, and CapMetro is researching a possible upgrade to 4G. For safety, the trains have ten cameras outside and six inside.
Planned expansions
Main article: Project Connect
Any expansion would need another referendum in the CapMetro service area to secure funding. CapMetro's All Systems Go Plan includes a study into possible future service. A new passing siding between Park St. and Discovery Blvd. in Leander was recently finished. Along with other improvements, it will let the Red Line run trains every 15 minutes for the first time, instead of the current maximum of about every 37 minutes. CapMetro also plans a new rail line along the abandoned MoKan railway line, which is owned by TxDOT, to Georgetown, Round Rock, and Pflugerville. As part of Project Connect, CapMetro has built a new Red Line station at McKalla, next to the Austin FC soccer stadium. A second station is proposed for North Burnet/Uptown (The Domain). When both are complete, they would replace the existing Kramer station.
In September 2008, CapMetro looked at the need for rail service to ease congestion downtown and reach Colony Park, with a possible extension to Elgin. CapMetro then decided to plan another line, the Green Line, which would also use existing freight tracks. The Green Line will be built from Downtown to Colony Park first, and the extension to Elgin will be considered later. In May 2018, the Travis County Commissioners Court voted 3–2 to move forward with a viability study of the Green Line.
Main article: Green Line (CapMetro)
Main article: Orange Line (CapMetro)
A contract for the Orange Line was approved on March 20, 2019. It is a planned 20-mile (32 km) light rail line that will run in its own dedicated transitway, from North Lamar Transit Center to Stassney & Congress. In 2020, the planned route was shortened to reduce construction costs, with bus bridges providing connections through the rest of the corridor.
Main article: Blue Line (CapMetro)
The Blue Line is a planned 15-mile (24 km) light rail line that will run from North Lamar Transit Center to Austin–Bergstrom International Airport.
Main article: Gold Line (CapMetro)
The Gold Line is a planned 9.5-mile (15.3 km) bus rapid transit line that would run from the Highland campus of Austin Community College to the South Congress Transit Center park-and-ride. It was changed to light rail in May 2020, but in July 2020 planning reverted to bus service to lower construction costs during the economic crisis caused by the COVID-19 pandemic.

Quiz time!
5 questions about CapMetro Rail
What does the Red Line connect?
Pictures
Keep exploring
This article is a child-friendly adaptation of the Wikipedia article on CapMetro Rail, available under CC BY-SA 4.0.
Images from Wikimedia Commons. Tap any image to view credits and license.