Keystone Service
The Keystone Service is a regional passenger train run by Amtrak. It is 195 miles (314 km) long and travels between the Harrisburg Transportation Center in Harrisburg, Pennsylvania and 30th Street Station in Philadelphia. The trains use the Philadelphia to Harrisburg Main Line, which is also known as the Keystone Corridor.
Most trains also continue along the Northeast Corridor (NEC) from Philadelphia to Penn Station in New York City.
A trip between Harrisburg and New York takes about 3 and a half hours. The trip between Harrisburg and Philadelphia takes about 1 hour and 45 minutes. Several express services can shorten both trips by about 15 minutes.
The line is considered higher-speed rail. Trains can travel up to 125 miles per hour (200 km/h) on parts of the Northeast Corridor and up to 110 miles per hour (180 km/h) on parts of the Keystone Corridor.
As of 2024, the Keystone Service is Amtrak's fifth-busiest route in the country and the third-busiest in the wider Northeast Corridor, carrying 1.27 million passengers. That was an increase of 13.7% over the previous fiscal year (FY2023). The route is mainly funded by the Pennsylvania Department of Transportation (PennDOT).
History
The Keystone Service continues many earlier trains that ran along the Philadelphia to Harrisburg Main Line. This route dates back to 1857, when the Pennsylvania Railroad (PRR) bought the Philadelphia and Columbia Railroad. By 1968, when the PRR merged with Penn Central, the line had commuter trains from Paoli to Suburban Station through 30th Street Station, regional trains between Harrisburg and Suburban Station, and express trains like the Broadway Limited and Duquesne, which skipped 30th Street Station and used only North Philadelphia station. In 1966, Governor William Scranton of Pennsylvania planned to buy 11 Metroliners to replace the Silverliners, but the deal fell apart, and Penn Central refused the cars in 1970. When Amtrak took over intercity passenger rail in 1971, people debated which trains were intercity and which were commuter services, a question that involved the ICC. Penn Central argued that several regional trains, including the 600-series trains, Clockers, and New York–Chatham service, could be discontinued. Courts and the ICC became involved, and in 1972 Amtrak took over the 600-series trains as Silverliner Service. Amtrak took over the Clockers too, and in 1975 it also took over ticketing. Penn Central, and later Conrail and SEPTA Regional Rail, kept running Paoli–Philadelphia commuter service. Work on the core New York–Washington service and the Budd plant is also part of this period, as is the UTU union's role in the court case and the ruling by Judge John P. Fullam.
In the late 1970s and 1980s, the service faced many problems. NJDOT leased its Arrow III and Arrow II railcars to Amtrak in 1978, and these were used on the Clockers, Keystone Service, and the new Chesapeake. Amtrak was short of electric locomotives, since the aging GG1 locomotives were nearing the end of their use, the E60 locomotives were unreliable, and new EMD AEM-7 locomotives were only beginning to arrive. Amtrak used Metroliners, which had been pronounced unsuitable for Harrisburg service earlier, and in 1981 the service was renamed Keystone Service. Ridership later fell sharply, and Amtrak cut the number of daily round trips several times. Some of the trains stopped at 52nd Street, Exton, Downingtown, Parkesburg, and Ardmore, and the Valley Forge and Keystone were later changed or extended. In 1988, Amtrak began running all Keystone Service trains on diesel power after the Metroliners grew unreliable and a wreck of the Night Owl left Amtrak short of locomotives. The Metroliners had been towed by AEM-7 locomotives, and the Spirit of St. Louis, National Limited, Keystone, and Pennsylvanian also changed over the years. Later, the Atlantic City Express and the Port Road Branch also appeared in this history, and the Atlantic City Express ended in 1995, while New Jersey Transit and its Atlantic City Line still serve 30th Street Station. Stops at Whitford and Malvern were also dropped, and Coatesville became an Amtrak-only stop.
Starting in 2000, Amtrak and PennDOT spent $166 million to rebuild the Main Line, which included electrified service and track work for speeds up to 110 miles per hour. When electric service returned in 2006, travel times fell and the number of daily round trips rose to 14. Later work aimed to remove public at-grade crossings so the line could safely reach 125 miles per hour west of Philadelphia, and the last two crossings near Mount Joy were closed in 2014. The COVID-19 pandemic led Amtrak to suspend all trains in 2020, and service was gradually restored, with most pre-pandemic service returning in 2022. Track work and bridge projects at Portal Bridge and the new Portal North Bridge also reduced service at times. A proposed infill station in Paradise Township would serve the local Plain community and offer tourists a link to the Strasburg Rail Road, but a 2004 plan was turned down by the Federal Railroad Administration because the curved track might not allow ADA-compliant boarding platforms.
Operation
Keystone Service trains are made up of push–pull sets of Amfleet I coaches, a Metroliner cab car, and a Siemens ACS-64 electric locomotive. The trains have one class of seating, coach class, with 2×2 seats. Seats are unreserved between Harrisburg and Philadelphia and reserved from Philadelphia to New York. Unlike most Amtrak routes, these trains do not serve food on board. By 2031, the trains are expected to be replaced by Amtrak Airo trainsets, which combine Siemens Venture passenger cars with a Siemens Charger diesel-electric locomotive.
The Keystone Service runs entirely on Amtrak-owned tracks, the Philadelphia to Harrisburg Main Line and the Northeast Corridor. Trains can travel up to 125 mph (201 km/h) on the Northeast Corridor and up to 110 mph (177 km/h) on the Main Line. On weekdays, there are thirteen Keystone trains and one Pennsylvanian train in each direction. All trains run between Harrisburg and Philadelphia, and nine Keystone trains plus the Pennsylvanian continue on to New York. Most trains take about 3 hours and 30 minutes to travel between Harrisburg and New York, including 1 hour and 45 minutes between Harrisburg and Philadelphia. Some express trains are about 15 minutes faster each way.
| Year | Passengers | Change | Passenger totals |
|---|---|---|---|
| FY08 | 1,127,518 | - | 500,000 1,000,000 1,500,000 2,000,000 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 |
| FY09 | 1,215,785 | +7.8% | |
| FY10 | 1,296,838 | +6.7% | |
| FY11 | 1,342,507 | +3.5% | |
| FY12 | 1,420,392 | +5.8% | |
| FY13 | 1,466,504 | +3.2% | |
| FY14 | 1,326,450 | −9.6% | |
| FY15 | 1,359,615 | +2.5% | |
| FY16 | 1,467,216 | +7.9% | |
| FY17 | 1,505,518 | +2.6% | |
| FY18 | 1,519,936 | +1.0% | |
| FY19 | 1,546,058 | +1.7% | |
| FY20 | 783,764 | −49.3% | |
| FY21 | 394,279 | −49.7% | |
| FY22 | 806,430 | +104.5% | |
| FY23 | 1,115,779 | +38.4% | |
| FY24 | 1,269,005 | +13.7% | |
| FY25 | 1,330,349 | +4.8% |
Stations
| State | Miles (km) | Town/City | Station | Connections |
|---|---|---|---|---|
| New York | 0 | New York City | Penn Station | |
| New Jersey | 10 (16) | Newark | Newark Penn Station | |
| 13 (21) | Newark Airport | |||
| 25 (40) | Iselin | Metropark | ||
| 33 (53) | New Brunswick | New Brunswick | ||
| 49 (79) | West Windsor | Princeton Junction | ||
| 58 (93) | Trenton | Trenton | ||
| Pennsylvania | 74 (119) | Cornwells Heights | Cornwells Heights | |
| 86 (138) | Philadelphia | North Philadelphia | ||
| 91 (146) | 30th Street Station | |||
| 95 (153) | Overbrook | Bypassed in 1988 | ||
| 97 (156) | Narberth | Narberth | Bypassed in 1982 | |
| 99 (159) | Ardmore | Ardmore | ||
| 100 (160) | Bryn Mawr | Bryn Mawr | Bypassed in 1988 | |
| 113 (182) | Radnor | Radnor | Bypassed in 1982 | |
| 115 (185) | Wayne | Wayne | Bypassed in 1988 | |
| 110 (180) | Paoli | Paoli | ||
| 111 (179) | Malvern | Malvern | Bypassed in 1998 | |
| 112 (180) | Exton | Exton | ||
| 113 (182) | Whitford | Whitford | Bypassed in 1998 | |
| 123 (198) | Downingtown | Downingtown | ||
| 129 (208) | Coatesville | Coatesville | ||
| 133 (214) | Parkesburg | Parkesburg | ||
| 159 (256) | Lancaster | Lancaster | ||
| 171 (275) | Mount Joy | Mount Joy | ||
| 177 (285) | Elizabethtown | Elizabethtown | ||
| 185 (298) | Middletown | Middletown | ||
| 195 (314) | Harrisburg | Harrisburg Transportation Center | ||

Quiz time!
5 questions about Keystone Service
Which two cities does the Keystone Service travel between?
Pictures
Keep exploring
This article is a child-friendly adaptation of the Wikipedia article on Keystone Service, available under CC BY-SA 4.0.
Images from Wikimedia Commons. Tap any image to view credits and license.