3 World Trade Center
3 World Trade Center (also known as 175 Greenwich Street) is a skyscraper built as part of the new World Trade Center in Lower Manhattan, New York City. The tower stands on Greenwich Street, along the eastern side of the World Trade Center site. The building was designed by Rogers Stirk Harbour + Partners. Silverstein Properties manages it through a ground lease with the Port Authority of New York and New Jersey, which owns the land. The building is 1,079 feet (329 meters) tall and has 80 stories. As of 2025, it is the tenth-tallest building in the city.
This is the second building on the World Trade Center site to carry the address 3 World Trade Center. The first was the Marriott World Trade Center, a 22-story hotel with 825 rooms in the southwest corner of the complex. It opened in July 1981 as the Vista International Hotel. It was destroyed during the September 11 attacks in 2001, along with the rest of the World Trade Center.
The current 3 World Trade Center was first planned to be 1,240 feet (378 meters) tall. Its groundbreaking took place in January 2008, but only the lower floors were built, because the skyscraper did not yet have an anchor tenant. Construction started again in 2014, after the advertising company GroupM agreed to become the anchor tenant. The building's concrete core was topped out in August 2016, and its outer steel frame followed on October 6, 2016. The building opened on June 11, 2018.
Site
Main article: World Trade Center site
3 World Trade Center is at 175 Greenwich Street, within the new World Trade Center (WTC) complex, in the Financial District neighborhood of Lower Manhattan in New York City. The land lot is bounded by Greenwich Street to the west, Dey Street to the north, Church Street to the east, and Cortlandt Way to the south. Nearby World Trade Center buildings include the National September 11 Memorial & Museum to the west, One World Trade Center to the northwest, the World Trade Center Transportation Hub and 2 World Trade Center to the north, and 4 World Trade Center to the south. Outside the complex, 195 Broadway and the Millennium Hilton New York Downtown hotel are to the northeast, and One Liberty Plaza is to the southeast.
For most of the 20th century, the site was occupied by the Cortlandt Building, built in 1907, which was one of two office buildings in the Hudson Terminal complex. The area was once part of Manhattan's Radio Row, which had many electronics stores. The Hudson Terminal complex was demolished in 1972, when the original World Trade Center was built. The Port Authority of New York and New Jersey (PANYNJ), which was responsible for the construction of the World Trade Center, closed several streets, including parts of Cortlandt, Dey, and Greenwich Streets. The site of the current skyscraper was once occupied by 5 World Trade Center. Terrorists destroyed the World Trade Center during the September 11 attacks, and Greenwich Street was later restored. The 3 World Trade Center address was first used by the Marriott World Trade Center, originally the Vista International Hotel, a 22-story hotel building with 825 rooms on the western side of the complex near West Street and Liberty Street. It was heavily damaged in the 1993 World Trade Center bombing and reopened in 1994 after repairs. The Host Marriott Corporation acquired the hotel in 1995 for $141.5 million. Forty people in the hotel died when the complex was destroyed during the September 11 attacks. In 2003, Marriott gave up its long-term lease, which allowed the National September 11 Memorial & Museum to be built there.
History
Larry Silverstein had leased the original World Trade Center from the PANYNJ in July 2001. His company Silverstein Properties kept paying rent on the site after the September 11 attacks. In the months after, people discussed ideas for rebuilding through urban planning meetings and forums. The architect Daniel Libeskind won a competition to design the master plan in February 2003, and by July 2004 two towers were planned for the southeast corner of the site. Disputes over who would redevelop the towers caused delays until the PANYNJ and Silverstein reached an agreement in 2006. Silverstein gave up the rights to develop 1 and 5 WTC in exchange for financing with Liberty Bonds for 2 World Trade Center, 3, and 4 WTC. In May 2006, British architect Richard Rogers of Rogers Stirk Harbour + Partners was hired to design the new 3 World Trade Center at 175 Greenwich Street. Norman Foster and Fumihiko Maki were chosen for 2 and 4 World Trade Center. The lowest stories of 3 World Trade Center were planned to be part of a rebuilt Westfield World Trade Center Mall. Cortlandt Street, which had been closed for the original towers, was planned to be rebuilt between 3 and 4 WTC, and it was eventually made into an outdoor path.
In 2007, the PANYNJ began building the East Bathtub, the site that would form the foundations of 3 and 4 WTC, using a slurry wall. The agency gave the site to Silverstein on February 17, 2008. In mid-2008, Merrill expressed interest in moving its headquarters to 3 World Trade Center, but it withdrew from the project in July 2008. The PANYNJ then delayed the project's completion, and a 2009 study predicted that 3 WTC would not be fully occupied until 2037, due to the 2008 financial crisis. By May 2009, the PANYNJ wanted to reduce the size of 2 and 3 WTC and postpone 5 WTC, citing the Great Recession and disagreements with Silverstein. New York City mayor Michael Bloomberg tried to mediate with little success, and Silverstein requested arbitration in 2009. An arbitration panel ruled in January 2010 that the agency did not owe him damages. In March 2010, the PANYNJ and the New York city and state governments agreed to fund $600 million for 3 WTC's construction, on the condition that the agency also fund a reconstruction of the Bayonne Bridge. Three PureCell fuel cells were delivered to the site in November 2010. The investment bank UBS considered leasing space in 2011 but decided against it.
Construction moved forward in stages. In early 2012, Silverstein and the PANYNJ agreed to build only the first seven stories unless tenants were found. The base had been built with insurance proceeds, and the media company Viacom and the financial firm Citigroup both declined to move to 3 WTC. In late 2012, the advertising company GroupM and the law firm White & Case were in talks to lease space. GroupM signed a letter of intent in mid-2013 and finalized its lease that December, taking 500,000 square feet. U.S. senator Chuck Schumer helped obtain $340 million in federal bonds for the project. In 2014, the PANYNJ voted against guaranteeing $1.2 billion of construction loans, but the agency and Silverstein reached a financing agreement the next month. The building was mainly funded by $1.6 billion of tax-exempt municipal bond sales. Unusually for a high-rise, the concrete core was built before the rest of the structure. The Fundrise company sold $5 million of the building's bonds to private investors in 2015. On May 20, 2016, the tower reached 1,000 feet, officially becoming a supertall building. The building officially opened on June 11, 2018, when it was 38 percent occupied. Later tenants included the stock exchange platform IEX, McKinsey & Company, Hudson River Trading, Casper Sleep, Diageo, Asana Inc., Better.com, Uber, Kelley Drye & Warren, Cozen O'Connor, Blue Wolf Capital Partners, and Freshfields Bruckhaus Deringer. GroupM also expanded its space and hired to redesign 15 floors for its companies.
Architecture
3 World Trade Center was designed by Richard Rogers of Rogers Stirk Harbour + Partners, and its structural engineer was WSP Global. The building is 1,079 feet (329 m) tall with 80 stories above ground, and its lowest 17 stories form a podium. Its outer walls, called the facade, are mostly a curtain wall of double-glazed, low emissivity glass panels. Many of these panels are made of annealed glass, which is more resistant to shattering than traditional glass. On the eastern and western elevations, diagonal beams covered in stainless steel strengthen the superstructure. Inside, the lobby has a large mural by James Rosenquist, and since 2025 it has also held a copper sculpture by Frank Gehry.
The building covers 2.5 million square feet in total and uses 27,000 short tons of steel and 145,000 cubic yards of concrete. It has 44 passenger elevators and five service elevators, and four of the service elevators are designed for emergency evacuations. The ground, second, and third stories are used for shops and other retail space, with two more basement levels that are part of the Westfield World Trade Center mall. The mall connects to the World Trade Center Transportation Hub, which links with the New York City Subway and PATH trains. The air-conditioning on each story is controlled separately, which reduces energy use. The building's filtration systems can remove 95 percent of particulates, as well as ozone and volatile organic compounds. Jaros, Baum & Bolles installed the mechanical, electrical, and plumbing system.
Critical reception
When 3 WTC was completed in 2018, James Gardner of The Real Deal New York wrote that he could say with reasonable confidence that it would be the least architecturally interesting of the four main buildings on the site. He particularly criticized the design's arbitrary asymmetries, its industrial look in one part but not another, and the shift in cladding patterns.

Quiz time!
5 questions about 3 World Trade Center
Why were only the lower floors of 3 World Trade Center built after the groundbreaking in 2008?